DAE P103-100 KIT UL, kWh Smart Submeter Polaris 1000, 1 or 2 Phase, 3 Wire (2 hot Wire, 1 Neutral), 100A, 120/240v, 2 Split Core CTs
Newegg
5.0
1 review
Description
UL/cUL Listed, Conform to ANSI C12.1 national accuracy standards. Comes with a lower cover which has two 3/4" knockouts to connect the conduits. Confirmed by UL, fuse is not required when connecting the breaker of electric panel to the meter. P103-200 meter (or upgraded 3 Phase meter) and 2 100A split core CTs (CT-100SB) will be shipped. P153-200 KIT is ready for Cloud Metering (2nd picture) with DAE CC2030 Gateway. CC2030 will collect energy data from DAE electrical meters and send them to Clou
SKU: 4458313419795955427876803