Description
IMMERSION MINING BC40 Elite Support 200 Miners large-scale mining construction solutions
BC40 Elite Key Advantages
🔥 98% Miner Compatibility – Supports all major ASICs (Antminer, Whatsminer, Avalon)
⚡ 1MW Cooling Capacity – maintains 200 miners at peak efficiency
🌎 Global Deployment Ready – -25°C to 48°C ambient range
Technical Specifications
Category
Specification
Operational Benefit
Dimensions
40′ Container: 12.2m × 2.44m × 2.9m
Standard shipping size (no special permits)
Miner Capacity
200Ă— S21 / 180Ă— T21 / 160Ă— S21 Imm
Optimized density for mixed fleets
Cooling System
10Ă— B100 Tanks (530L each) + 7,000L total
Dual-loop redundancy for zero downtime
Power Efficiency
1,437kW max load
58-93kW idle
Smart Controls
10Ă— Smart PDUs + Integrated power meters
Real-time per-rig energy tracking
Saves $42k/year vs. air cooling
Certifications: UL/CE (Meets NA & EU safety standards)
ROI Breakdown
(Based on 200Ă— Antminer S21 @ $0.07/kWh)
Metric
BC40 Elite
Traditional Air Cooling
Advantage
Cooling Energy Use
93kW
165kW
44% reduction
Annual OpEx
$57,000
$101,000
$44k saved
Miner Lifespan
5+ years
3 years
+66% longevity
Deployment Time
3 days
2+ weeks
80% faster
Calculations assume 24/7 operation at design temp (35°C)
âś…Â Compact Modular Design
Integrated container + dry cooler system saves 30% more space than traditional setups
âś…Â Plug-and-Play Deployment
All-in-one solution reduces installation time by 80%
Ready for mining in under 48 hours
âś…Â Industrial-Grade Efficiency
Maintains full 1MW cooling capacity in just 40ft standard container footprint
Key Benefit: Maximize your mining ROI with faster deployment and higher density than air-cooled alternatives!
âś…Â All-in-One Design
Freely switch between single-phase (200-277V) and three-phase (350-480V) power without hardware changes—compatible with different miners.
âś…Â Global Compatibility
Supports voltage standards in North America, Europe, Asia, and more for worry-free deployment.
âś…Â Mixed Miner Support
Run both older and newer miners (e.g., S19 & S21) in the same tank, maximizing farm efficiency.
âś…Â Smart Monitoring
Real-time power tracking per miner with automatic alerts—reducing maintenance costs.
Installation & Deployment
1. Site Requirements
Foundation: Level concrete pad (min. 10,000kg/m²)
Power: 2,000A 480V 3-phase input (or step-down transformer)
Clearance: 1m side access for maintenance
2. Plug-and-Play Components
âś” Pre-assembled dry cooler (top-mounted)
âś” Quick-connect coolant hoses (color-coded)
âś” Miner racks with tool-less mounting
3. Commissioning Process
Day 1: Crane placement + power hookup
Day 2: Coolant fill & pressure testing
Day 3: Miner installation + 24hr burn-in
4. Remote Management
SNMPv3 monitoring with cloud dashboard
Automated email/SMS alerts for faults
Why This Outperforms
✅ All-in-One Design – No field assembly required
✅ Military-Grade Durability – 10-year service life
✅ Future-Proof – Upgradable for next-gen 3nm ASICs
Ideal For:
Mining farms scaling to 5MW+
Hosting providers offering immersion services
Enterprises pursuing ESG compliance
Â
BC40 Elite Key Advantages
🔥 98% Miner Compatibility – Supports all major ASICs (Antminer, Whatsminer, Avalon)
⚡ 1MW Cooling Capacity – maintains 200 miners at peak efficiency
🌎 Global Deployment Ready – -25°C to 48°C ambient range
Technical Specifications
Category
Specification
Operational Benefit
Dimensions
40′ Container: 12.2m × 2.44m × 2.9m
Standard shipping size (no special permits)
Miner Capacity
200Ă— S21 / 180Ă— T21 / 160Ă— S21 Imm
Optimized density for mixed fleets
Cooling System
10Ă— B100 Tanks (530L each) + 7,000L total
Dual-loop redundancy for zero downtime
Power Efficiency
1,437kW max load
58-93kW idle
Smart Controls
10Ă— Smart PDUs + Integrated power meters
Real-time per-rig energy tracking
Saves $42k/year vs. air cooling
Certifications: UL/CE (Meets NA & EU safety standards)
ROI Breakdown
(Based on 200Ă— Antminer S21 @ $0.07/kWh)
Metric
BC40 Elite
Traditional Air Cooling
Advantage
Cooling Energy Use
93kW
165kW
44% reduction
Annual OpEx
$57,000
$101,000
$44k saved
Miner Lifespan
5+ years
3 years
+66% longevity
Deployment Time
3 days
2+ weeks
80% faster
Calculations assume 24/7 operation at design temp (35°C)
âś…Â Compact Modular Design
Integrated container + dry cooler system saves 30% more space than traditional setups
âś…Â Plug-and-Play Deployment
All-in-one solution reduces installation time by 80%
Ready for mining in under 48 hours
âś…Â Industrial-Grade Efficiency
Maintains full 1MW cooling capacity in just 40ft standard container footprint
Key Benefit: Maximize your mining ROI with faster deployment and higher density than air-cooled alternatives!
âś…Â All-in-One Design
Freely switch between single-phase (200-277V) and three-phase (350-480V) power without hardware changes—compatible with different miners.
âś…Â Global Compatibility
Supports voltage standards in North America, Europe, Asia, and more for worry-free deployment.
âś…Â Mixed Miner Support
Run both older and newer miners (e.g., S19 & S21) in the same tank, maximizing farm efficiency.
âś…Â Smart Monitoring
Real-time power tracking per miner with automatic alerts—reducing maintenance costs.
Installation & Deployment
1. Site Requirements
Foundation: Level concrete pad (min. 10,000kg/m²)
Power: 2,000A 480V 3-phase input (or step-down transformer)
Clearance: 1m side access for maintenance
2. Plug-and-Play Components
âś” Pre-assembled dry cooler (top-mounted)
âś” Quick-connect coolant hoses (color-coded)
âś” Miner racks with tool-less mounting
3. Commissioning Process
Day 1: Crane placement + power hookup
Day 2: Coolant fill & pressure testing
Day 3: Miner installation + 24hr burn-in
4. Remote Management
SNMPv3 monitoring with cloud dashboard
Automated email/SMS alerts for faults
Why This Outperforms
✅ All-in-One Design – No field assembly required
✅ Military-Grade Durability – 10-year service life
✅ Future-Proof – Upgradable for next-gen 3nm ASICs
Ideal For:
Mining farms scaling to 5MW+
Hosting providers offering immersion services
Enterprises pursuing ESG compliance
Â
SKU: BC40Elit